Facilities Master Plan (FMP)

Facilities Master Plan Final Documents (pdf downloads)

  • (28.9 MB)

  • (39.3 MB)

  • (6 MB)

  • (35.2 MB)

  • (82.2MB)

Presentations and documents (pdf downloads)

  • (2.7 MB)

  • (6.1 MB)

  • (63 K)

FMP Background and Process

The State University Construction Fund (SUCF) conducted Facilities Master Plans (FMPs) at each of the 32 four-year SUNY campuses. The plans will provide criteria and guidelines for campus improvements and facilities developments for the ten-year period from 2013 to 2023. SUCF conducted the unique large-scale planning effort with the distinct charge for each campus’ facilities plan to be closely aligned with its academic mission and strategic vision.

The consultant Perkins+Will was secured to conduct 91ÉçÇø’s FMP. Through analysis of the University from diverse perspectives, Perkins+Will developed a unified and flexible plan that captures the spirit of BU and addresses facilities challenges and opportunities at the existing campuses and other opportunity sites. The FMP followed a five-phase process, as outlined by SUCF, consisting of:

  • Phase 1: Campus Profile
  • Phase 2: Assessment of Conditions
  • Phase 3: Analysis of Space Needs
  • Phase 4: Concept Alternatives
  • Phase 5: Final Recommendations
  • The five phases have been completed.